Remote-processing CAMBASIC Uživatelský manuál Strana 204

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 208
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 203
Event Multitasking - 15
executed and then go low.
The PU LSE function r eturns the rem aining time of each stage. The example below demonstrates this.
10 PULSE 0,0,1,.05,1
30 A = PULSE(0):IF A=0 THEN STOP
40 PRINT A
50 GOTO 30
RUN
.03
.02
.02
.02
.01
.01
.01
5E-03
5E-03
5E-03
STOP
Operation o f a Multiple P ulsed Outpu ts
The real power of the PULSE operation comes when it is combined with the ON INP tasking statement and multiple timed
outputs are required. The application could involve pneumatic valves, injection molding steps or other sequence– oriented
operations. T he following (lame) ex ample sim ulates a dru m timer by turning on outputs w hen a previous timed pulse is
complete. The job here is a bag sealing operation. A pre-heater is started and sealing head is brought down when the start
switch is pressed. After the pre-heater is timed out, the heater is turned on for a second. The head is down for 4 seconds.
When the head is done, an interrupt is generated which moves the package to the next place. Opto rack positions 0-4 are
used to control a sealing head, pre-heater, heater, and pusher.
CONFIG PIO 1,0,0,0,0,0
'Detect start switch
ON INP 0,0,1,1 GOSUB ..start
'
'Detect emergency or STOP switch
on inp 1,0,2,2 gosub ..emergency
'
'Generate interrupt when head goes up
on inp 2,2,2,1 GOSUB ..headup
'
'Generate interrupt when pre-heat done
on inp 3,1,1,2 gosub ..preheat
'
'rest of program
'
'
..start
'Start switch was pushed. Now start sequence
bit 2,4,1 :'reset bag pusher
pulse 0,2,0,2,0 :'turn on pre-heat for 2 seconds
pulse 1,2,1,4,0 :'Bring down sealing head for 4 seconds
return
'
Zobrazit stránku 203
1 2 ... 199 200 201 202 203 204 205 206 207 208

Komentáře k této Příručce

Žádné komentáře